20250414_1245_Sunset Over Data Centre_simple_compose_01jrtstytkeyrvzyazyhxc6p9k.jpg

Data Centre Opportunity

Unlocking Scalable, Reliable, and Efficient Power for AI & High-Density Computing

Scalable & Reliable Power Infrastructure

18.6 MW current capacity, expandable to 50 MW with a clear pathway to 100+ MW.

  1. Existing on-site natural gas generation, with rapid ramp-up capability (full load in 6-8 minutes).

  2. 138 kV transmission line access with robust grid connectivity.

  3. Potential for energy storage & alternative renewables integration (e.g., solar, wind, hydrogen).

Clean Energy & Decarbonization Pathway

Hydrogen-ready power generation: Current Wärtsilä 20V34SG units can accommodate a hydrogen blend, reducing emissions while maintaining reliability.

Potential for large-scale renewable integration including:

  1. Solar and wind energy expansion to complement natural gas generation.

  2. Battery energy storage for enhanced grid stability and efficiency.

  3. Carbon capture and storage (CCS) potential, leveraging regional storage opportunities.

Flexible off-grid and grid-tied solutions to optimize sustainability for data centre operations.

Strategic Advantages

Abundant natural gas supply – Alberta is a leader in low-cost natural gas, ensuring stable and scalable energy sources.

  • Multiple on-site natural gas supply options ensures long-term price stability and energy security.

Alberta’s cool temperatures year-round significantly reduce data centre cooling costs, which can be one of the biggest operational expenses for high-density computing.

Proximity to Grande Prairie – A major regional hub 60 km away, providing a skilled workforce, industrial services, and strong infrastructure support.

Prime Industrial Location with Ready Infrastructure

Strategically located near Grande Prairie (~60 km west) and 2 km from Elmworth.

  1. Zoned for industrial use, minimizing permitting complexity.

  2. All-season road access for large-scale construction and equipment transport.

  3. Existing fiber optic connectivity with high-speed data capability (3Gbps+ scalable).

Project Readiness & Fast-Track Development

Infrastructure in place, allowing immediate project engagement.

Experienced energy developer with a deep understanding of permitting, grid integration, and regulatory approvals.

Strong industry relationships with leading engineers, consultants, and equipment suppliers.

Alberta Data Centre Power Plant Project